It has an oiled finish that protects it from corrosion for some time when used in furniture. The oil and petroleum industries use black steel pipe for moving large quantities of oil through remote areas. This pipe is not used for drinking water but black steel pipe’s strength makes it ideal for transporting water and gas in rural and urban areas and for conduits that protect electrical wiring and for delivering high pressure steam and air. It’s used in applications that don’t require galvanized steel. Its name comes from the scaly, dark-colored iron oxide coating on its surface. The black steel finish of these plumbing pipe fittings is created in a process in manufacturing of this pipe fitting after casting. These pipe fittings have a 1/2″ BSPT thread. Use this fitting to create your plumbing pipe construction tables, chairs, shelving, door handles, or any other project. The raw cast iron surface texture of this 90 degree bend shows in perfect detail since there is no zinc or gal coating. Use these fittings to create your plumbing pipe construction tables, chairs, shelving, door handles, or any other project. Previously only available as special order from the USA or China, we now have large stocks in the warehouse in Melbourne, Australia.īlack steel plumbing pipe fittings and pipe are the perfect industrial fittings to go with your industrial themed bar, cafe, restaurant or home. We have recently secured a range of black steel plumbing pipe and fittings in 1/2″, 3/4″ and 1″ BSPT threads to use in the construction of furniture and shelving. Higher schedules are heavier, require more material and are therefore more costly to make and install.Black steel plumbing pipe fittings are now stocked in Melbourne Australia. Sizes without an S are for carbon steel.) (S following a number is for stainless steel. Higher schedules mean thicker walls that can resist higher pressures. Schedule, often shortened as SCH, is a North American standard that refers to wall thickness of a pipe or pipe fitting. What does “schedule” mean for pipe fittings? Higher schedules are heavier, require more material and are therefore more costly to make and install.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |